龙发快装
Installation Time

LongFa 3D Wall

1st Step Staple or screw wooden slats on the wall
2st Step Mount and fix LongFa 3D panels on the slats

Plasterboard

1st Step Erect substructure (metal or wooden substructure)
2st Step Mount plasterboard (20 to 25 fixing points per panel)
3st Step Fill fixing holes and joints
4st Step Time for drying
5st Step Smooth or sand jojits and holes
6st Step Apply primer coating
7st Step Time for drying
8st Step Paint finishing color (possibly require 2 coatings)
9st Step Time for drying
Cost
LongFa 3D Wall Plasterboard

LongFa 3D Wall is incredibly cost-effective

Franchisee Access

Sign up

Company Tel: 626-888-8887 Company E-mail: LongFa-Franchising@LongFa.us Company address: 17101 Gale Ave, City of Industry, CA 91745